MindStudy, question and answer site designed to help students, to help each other:
To ask, to learn, to share, to grow.
Get the right answers. Fast
Submit answers for community.
Pat yourself on the back. You deserve it.
542 questions
Cathode Ray Tube (CRT)
CRT stands for Cathode Ray Tube. CRT is a technology used in traditional computer monitors and televisions. The image on CRT display is created by firing electrons from the back of the tube of phosphorus located towards the front of the screen.
Briefly Discuss about Requirements Analysis
After requirements gathering is complete, the analyst analyses the gathered requirements to form a clear understanding of the exact customer requirements and to weed out any problems in the gathered requirements.
Discuss about SCHEDULING
Scheduling the project tasks is an important project planning activity. In order to schedule the project activities, a software project manager needs to do the following: 1. Identify all the major activities that need to be carried out to complete the project.
Discuss about Staffing
Software project managers usually take the responsibility of choosing their team. Therefore, they need to identify good software developers for the success of the project. A common misconception held by managers as evidenced in their staffing, planning and scheduling practices, is the assumption that one software engineer is as productive as another.
Discuss Analysis Modeling Concepts and Approaches
One view of analysis modeling, called structural analysis, considers data and the processes that transform the data as separate entities.
Write Short Note on Rapid Application Development
The rapid application development (RAD) model was proposed in the early nineties in an attempt to overcome the rigidity of the waterfall model (and its derivatives) that makes it difficult to accommodate any change requests from the customer.
Briefly discuss about Critical Path Method (CPM)
CPM and PERT are operation research techniques that were developed in the late 1950s. A path in the activity network graph is any set of consecutive nodes and edges in this graph from the starting node to the last node. A critical path consists of a set of dependent tasks that need to be performed in a sequence and which together take the longest time to complete.
What is ISO 9000 Certification? How to Get ISO 9000 Certification?
ISO 9000 certification serves as a reference for contract between independent parties. In particular, a company awarding a development contract can form his opinion about the possible vendor performance based on whether the vendor has obtained ISO 9000 certification or not. In this context, the ISO 9000 standard specifies the guidelines for maintaining a quality system.
Why Required of ISO 9001:2000 standard?
ISO 9001:2000 specifies requirements for a quality management system where an organization 1. needs to demonstrate its ability to consistently provide product that meets customer and applicable regulatory requirements, and
Short Notes :Lines of Code (LOC)
LOC is possibly the simplest among all metrics available to measure project size. Consequently, this metric is extremely popular. This metric measures the size of a project by counting the number of source instructions in the developed program.
Copyright © 2025 MindStudy
A product by Shunya Intelliware Solution
(Registered under MSME Uddyam)